General | |
Source River | : Midim River |
District | : Lamjung |
Zone | : Gandaki |
Development Region | : Western |
Province | : Gandaki |
Type of Scheme | : Run-of-River |
Latitude | : 28012’15” N to 28010’53” N |
Longitude | : 84017’30” E to 84016’31” E |
Gross Head | : 51.98 m |
Net Head | : 48.69 m |
Design Discharge | : 7.30 m3/s |
Installed Capacity | : 3.00 MW |
Hydrology | |
Catchment Area | : 136.50 km2 |
Design 100-yrs Flood | : 460 m3/s |
Diversion Weir | |
Weir Type | : Concrete Infilled Boulder Weir |
Length | : 22.0 m |
Crest Level | : 592.80 amsl |
Height | : 5.50 m |
Intake | |
Type | : Side Intake |
No | : 2 |
Opening Size | : 3.30 X 2.0 m (W x H) |
Velocity of flow | : 0.8 m3/s |
Undersluice | |
Size (W X H) | : 2 X 2 m |
No. of Bays | : 2 |
Gravel Trap | |
Length of Gravel Trap | : 1.90 m |
Width of Gravel Trap | : 7.80 m |
Length of Flushing Culvert | : 60.0 m |
Approach Canal | |
Type | : RCC culvert |
Length | : 170.92 m |
Width | : 2.20 m |
Depth including Freeboard | : 2.30 m |
Desilting Basin | |
Location | : Surface |
No of Basin | : 2 |
Size (L x W x H) | : 42 m x 5 m x 4.2 m |
Particle Size to be settled | : 0.2 mm |
Headrace Pipe | |
Type | : Circular |
Diameter | : 2 m |
Length | : 223.20 m |
Headrace Tunnel | |
Type | : Inverted D-Shape |
Length | : 1120.21 m |
Surge Tank | |
Type | : Top over to sky |
Diameter (Finished) | : 6 m |
Height | : 22.55 m |
Top level | : 600.95 amsl |
Upsurge Level | : 598.45 amsl |
Down surge Level | : 585.45 amsl |
Penstock Pipe | |
Length | : 120.00 m |
Diameter | : 1.80 m |
Powerhouse | |
Location | : Surface |
Clear Size (L x B x H) | : 23.3 m x 8.55 m x 20.40 m |
Number of Units | : 2 Nos. |
Type of Turbine | : Horizontal Axis Francis Turbine |
Rated Capacity | : 1.5 MW x 2 Nos. |
Tailrace Canal | |
Size (B X H) of RCC culvert | : 2.5 X 1.90 m (inside dimension) |
Length | : 200.00 m |
Transmission & Grid Connection | |
Specification | : 33 kV |
Conductor | : ASCR Dog |
Length | : 8.5 km |
Generator | |
No. of Units | : 2 |
Efficiency | : 96.51 % |
Power and Energy | |
Installed Capacity | : 3.00 MW |
Dry Season Energy | : 2.91 GWh |
Wet Season Energy | : 14.28 GWh |
Total Annual Energy (PPA) | : 17.19 GWh |
Others | |
Commercial Operation Date | : 2074/10/15 |